Lee was involved with the
original home design while working at Cushman Design Group of
Stowe in 2004. The home was completed in 2005. Starting in 2009,
LHA designed three additions to the original home. The clients were
planning to retire in the next few years and wanted to have a Master Bedroom
Suite on the Main Level. This required relocating a large Screened-in
Porch and adding a third bay to their existing Garage, along with other
changes within the original footprint.
Contractor: Gordon Dixon Construction